# Proposition de décoration pour un appartement de 210 m² à Cascais | Estúdio Albarrã

## Cover

### A smaller home above the sea at Cascais.

*Interiors proposal · Estúdio Albarrã*

Full-service interiors for your 210 m² apartment in Cascais, from first brief to the day the last cushion goes down.

- Prepared for: Margarida and Henrik Solberg
- Date: 15 February 2027
- Keys: Monday 13 September 2027

*Living room opening onto the sea terrace*

*Estúdio Albarrã*

## The brief

### Half the space, none of the compromise

*The brief, as we heard it*

You are leaving 420 m² in Linhó for 210 m² above the bay at Cascais. Three bedrooms, one long terrace facing the sea, and keys on 13 September 2027.

Margarida wants a kitchen she can cook for twelve in. Henrik wants the terrace to work in January, not just August. You are bringing eleven pieces from the house, including the Solveig Vang table, and letting the rest go.

You would like to be living there by the first week of October. If we have any of this wrong, tell us before you read on.

## The idea

Half the house, and all of the life you want to keep in it.

## Materials

### Six materials, chosen for salt air

Cork, oak, lime, Estremoz stone, linen and a deep blue glaze. Everything here copes with sea air and bare feet. We'd send the physical samples to Linhó the week concept is signed off.

*Bronze pull on fluted oak joinery*

*Folded linen on an oak bench*

*Cork panel beside pale oak*

*Limewashed plaster wall*

*Estremoz marble worktop edge*

*Blue glazed ceramic tiles*

## How we work

### Seven months, two of us at every meeting

Joana leads the design. Miguel runs procurement and site. We started the studio in 2017 and there are five of us, so the people you meet are the people drawing. The calendar is set by what takes longest to make.

### 1. Brief, three weeks

Two long sessions at Linhó, a measured survey of the apartment from the developer's drawings, and an inventory of the eleven pieces you are bringing.

### 2. Concept, four weeks

Two schemes for the whole apartment, each walked through in 3D on a headset at our studio. You pick one, or tell us what to steal from the other.

### 3. Developed design, five weeks

Kitchen and wardrobe joinery drawn in detail, lighting and smart controls plan, terrace layout and a finish schedule for every surface.

### 4. Specification, three weeks

Every item on a live FF&E schedule you can open on your phone, priced at trade, with its lead time next to it. You sign off orders there.

### 5. Procurement, fourteen weeks

Orders placed in one week in June. Upholstery takes fourteen weeks and joinery ten, so this is the stretch that decides the move-in date.

### 6. Installation and styling, three weeks

Joinery fitted from the day we get keys, furniture delivered and installed the following week, then two styling days before you move in.

## Room by room

Our starting position for each space, before concept. Some of it we'd expect you to argue with, and that is the point of the brief sessions.

### Kitchen and dining, one long room

*Kitchen with marble island and cork pantry wall*

### Living room facing the bay

*Living room with low sofa facing the sea*

### The terrace, used in January

*Terrace bench and glass windbreak above the sea*

### Principal suite

*Bedroom with fluted oak wardrobe wall*

### Guest room that works as a study

*Study with oak wall panels and a desk by the window*

## Clients

### From people who moved in with us

> Miguel rang the sofa workshop every Friday for fourteen weeks. It arrived two days before the movers did. We had been told by two other studios that October was impossible.

— Teodora Pais, Client, Apartamento Restelo

> They put six units in our Ericeira building on one live schedule. Every buyer could see their own orders. Our sales team stopped fielding calls about delivery dates.

— Bárbara Quintela, Development Director, Ribamar Living

> We came from a house four times the size. Joana made us choose nine pieces to keep, and told us honestly which ones would not fit. We have not missed the rest once.

— Oskar and Leonor Faria, Clients, Casa Alvide

## Fee and budget

### Our fee, and your furniture budget

In euros, plus IVA at 23%. Our design fee is fixed and built from day rates: Joana 720, Miguel 680, designers 480. The furniture budget is your money, paid to suppliers at trade price. We keep none of the discount.

### Studio fee

#### Design, brief to styling

| Item | Price |
| --- | --- |
| Brief, survey and inventory | $3,960.00 |
| Concept, two schemes in 3D | $11,240.00 |
| Developed design | $14,870.00 |
| Specification and live FF&E schedule | $8,615.00 |
| Installation and two styling days | $6,380.00 |
| Project management, 10% | $4,507.00 |

#### Procurement and order management

| Item | Price |
| --- | --- |
| Ordering, tracking and delivery | $33,408.00 |

### Furniture, fixtures and equipment

#### FF&E budget

| Item | Price |
| --- | --- |
| Joinery | $96,800.00 |
| Upholstery and loose furniture | $84,350.00 |
| Lighting and smart controls | $31,270.00 |
| Stone and surfaces | $27,940.00 |
| Soft furnishings and window treatments | $22,690.00 |
| Art hanging, rugs and styling | $15,350.00 |
| Contingency, 10% | $27,840.00 |

- IVA: 23%

## Programme

Orders must be placed by Friday 18 June for the sofa and joinery to land after keys and before October. Assumes your comments within three working days at each review. A late sign-off moves move-in, week for week.

| Task | Start | End | Duration | Label |
| --- | --- | --- | --- | --- |
| Brief sessions, survey and inventory | 2027-03-02 | 2027-03-19 | 5 days | Design |
| Two concept schemes, 3D walkthrough | 2027-03-23 | 2027-04-16 | 5 days | Design |
| Developed design, joinery and lighting | 2027-04-20 | 2027-05-21 | 5 days | Design |
| Specification and order sign-off | 2027-05-25 | 2027-06-11 | 5 days | Design |
| All orders placed | 2027-06-14 | 2027-06-18 | 5 days | Procurement |
| Joinery manufacture, 10 week lead time | 2027-06-21 | 2027-08-27 | 5 days | Procurement |
| Upholstery, 14 week lead time | 2027-06-21 | 2027-09-24 | 5 days | Procurement |
| Keys, joinery fitted on site | 2027-09-13 | 2027-09-24 | 5 days | Installation |
| Furniture delivery and installation | 2027-09-27 | 2027-10-01 | 5 days | Installation |
| Styling days, then you move in | 2027-10-04 | 2027-10-06 | 5 days | Installation |

## Terms

### The small print, said plainly

The questions couples ask us most once the excitement wears off. If something here worries you, we'd rather talk about it now.

### What happens to a deposit if we change our minds?

Most suppliers take 50% on order and the balance before delivery. Bespoke joinery and upholstery cut to your fabric are non-refundable once production starts.

Change your mind within 48 hours of signing an order and we can usually cancel it. After that, the deposit is lost, and we will tell you the figure before you decide.

### Site access before and after keys

The developer, Alvarim Residências, allows two measured visits before handover and no work on site. Everything is fitted from 13 September.

If handover slips, installation slips with it. We hold goods in a bonded store in Alcabideche for up to six weeks at no charge; after that, storage is billed at cost.

### Can you photograph the apartment?

We'd like to, two weeks after you move in, for our portfolio. Nothing that identifies the building or you, and you see every image before it is used.

You can say no, and it changes nothing about the fee.

### How many revisions are included?

Two rounds at concept and two at developed design. A change after specification sign-off is a variation, priced in writing before we do the work.

### How do we pay the studio fee?

The design fee: 30% on signing, 30% at concept sign-off, 25% at specification, 15% after styling. Procurement is invoiced monthly as orders are placed. Fourteen days from invoice.

## Approval

### Next step

This proposal holds until Friday 26 February 2027. Sign below and we will book the first brief session at Linhó for the week of 2 March.

### Prepared by

**Joana Albarrã and Miguel Sena**
Founders, Estúdio Albarrã

Rua da Esperança 118
1200-658 Lisboa
joana@albarra.pt

### For approval by

**Margarida and Henrik Solberg**
Rua das Amendoeiras 7, Linhó
2710-321 Sintra

If you would rather talk first, we can come to you on Wednesday 24 February.

### Appoint Estúdio Albarrã

By signing, you appoint us for full-service interiors at a studio fee of €82,980 plus IVA, starting Tuesday 2 March 2027. The FF&E budget is approved separately, order by order, on the live schedule. The first invoice, 30% of the design fee, is issued on signing.