Scope commercial office fit-outs with this interior design statement of work template: phased deliverables, FF&E management, delivery method and fixed fee.

Document goalLock in scope, fees, and phased deliverables with office clients, from test fit to move-in, before design work begins.
Last updatedOct 20, 2026
Palette
Customize

Make it yours, in seconds

Every template is a starting point. Drag to shift colour, typography and layout — the live preview updates as you move.

Move the dots to shift colour, typography and layout. The preview updates live.

Warm
Cool
Muted
Bold
Color
Type
Layout
Build

Get more from every document

Lock in scope, fee and schedule for an office fit-out before the first drawing goes out. Phased deliverables, sign-off gates, and an FF&E order deadline keep both sides working from the same page.

Get the yes without the PDF

Your client reads the scope, checks the price, and signs on the same page, so no printing, scanning, or email chase.

Sections

Assemble agreements from proven sections

Drop in pricing, steps, and terms blocks, then save your own versions to reuse on every new client agreement.

Clients sign cleanly on any screen

Your scope, pricing, and terms stay readable on a phone in a cab or a laptop at the desk, with one layout.

Analytics editor preview

See which terms your client lingers on

Heatmaps show whether they stall on pricing or the accordion FAQ, so your follow-up lands before doubts settle.

Document notification preview

Know the second they open it

Get pinged when your client views, comments, or signs, so you can answer a question while the project is still warm.

Real-time collaborative editing preview

Draft the agreement with your team

You tune pricing while your producer fills in tasks and steps, all in the same document, live, before it goes out.

Preview

See how every part fits

The SOW opens with project scope and the FF&E deadline, then moves through delivery, phases, fees and terms, and closes on a signature date. Keep, drop, or reorder any section to fit your project.

Interior Design SOW Cover Page with Project Overview
section hero

Interior Design SOW Cover Page with Project Overview

Opens with the client, the studio and the project at a glance: 36,400 sq ft across two floors, with a February 2028 occupancy. Sets the scope and the deadline before the reader goes any further.

Parties, Dates and Scope of Work Under the MSA
section text

Parties, Dates and Scope of Work Under the MSA

Names the parties, ties the SOW to the master services agreement and states which document governs in a conflict. Defines the scope and key dates so both sides start from the same baseline.

Critical Constraint: FF&E Lead Time and Order Deadline
section text animated

Critical Constraint: FF&E Lead Time and Order Deadline

A short, memorable statement of the one fact that drives the schedule: chair lead times set the date, so orders go in September. Gives the client an early reason to decide on time.

Delivery Method: Negotiated GC with Design-Assist
section steps

Delivery Method: Negotiated GC with Design-Assist

Explains why a negotiated general contractor with design-assist was chosen. It costs slightly more up front but removes bid surprises, which matters when the occupancy date is fixed.

Deliverables by Phase with Sign-Off Gates
section breakdown

Deliverables by Phase with Sign-Off Gates

Lists what the client receives and approves at the end of each design phase. Each sign-off releases the next fee stage, so progress, approvals and payment stay linked.

45-Week Project Programme and Schedule Assumptions
section tasks

45-Week Project Programme and Schedule Assumptions

Lays out the path to occupancy and the two waits that drive it: SDCI permit review and FF&E lead times. States the assumed three-working-day client sign-off so responsibilities are clear.

Fixed Fee and Payment Schedule with FF&E Budget
section pricing

Fixed Fee and Payment Schedule with FF&E Budget

Sets a fixed fee of $11.03 per usable sq ft, including the architect of record and MEP engineers. Separates the $1.36m–$1.52m FF&E budget plus 10% contingency, bought at trade pricing.

Client References from Fixed-Date Workplace Fit-Outs
section testimonials

Client References from Fixed-Date Workplace Fit-Outs

Offers three callable references from workplace and lab fit-outs delivered to fixed occupancy dates. Contact details come in the reference pack sent with the countersigned SOW.

SOW-Specific Terms That Protect Fee and Schedule
section accordion

SOW-Specific Terms That Protect Fee and Schedule

Collapsible clauses covering only the points that decide whether the fee and February date hold. Everything else defers to the MSA, so the document stays short and easy to review.

Measurable Handover Commitments and Performance Targets
section card

Measurable Handover Commitments and Performance Targets

Six figures the design targets, tests on site and reports in the closeout pack. If one misses, the studio explains why and what it costs to fix, which keeps accountability concrete.

Next Step: SOW Acceptance and Signature Deadline
section agreement

Next Step: SOW Acceptance and Signature Deadline

Gives the validity date of 26 March 2027 and explains why: after it, the September order release and the February date need re-checking. Prompts a timely countersignature.

FAQ

Find your answers

Answers to common questions about writing a commercial interior design statement of work for office clients, from fixed fees to phased sign-offs.

A solid project agreement should include a cover page, the parties and scope of work, any constraints (such as budget, time, or resources), the delivery method, a list of deliverables, and a programme or timeline. Together these sections set clear expectations, define responsibilities, and reduce the risk of disputes.

Replace the placeholder text on the cover and in the Parties and scope section with your own names, project details, and boundaries. Then edit The constraint, Delivery method, Deliverables, and Programme sections to match your project's requirements. Delete any sections you don't need and add clauses where your project calls for them.

The constraint section states the key limits the project must work within, such as budget, deadline, regulatory requirements, or resource availability. Documenting it up front aligns both parties on what is realistic and gives you a reference point if scope changes or delays occur.

Yes. The structure of scope, constraints, delivery method, deliverables, and programme applies to construction, consulting, software development, creative services, and more. Adjust the terminology and deliverables to suit your industry, and have a legal professional review it if your project carries specific regulatory or liability requirements.

List each deliverable separately, assign a clear completion date or milestone to it, and link those dates to the overall programme. Allow buffer time for reviews, approvals, and dependencies, and make sure the dates respect the limits set out in The constraint section. Both parties should agree to the schedule before signing.

Explore

Browse more interior design templates

More templates for interior designers who write proposals and agreements for commercial office clients.

Miami
MiamiFF&E procurement statement of work for designers
Amsterdam
AmsterdamShow apartment design proposal for property developers
Chicago
ChicagoWorkplace interiors proposal for law firms
Lisbon
LisbonFull-service interiors proposal for homeowners
Stockholm
StockholmRestaurant interior concept proposal for chefs
London
LondonMonthly design retainer for hospitality clients